Converting a Stucco House to Siding in the Lower Mainland
How a stucco to siding conversion works on a Lower Mainland home, from asbestos testing and removal to what we find behind old stucco and how walls are rebuilt.

Converting a stucco house to siding in the Lower Mainland usually means testing the stucco for asbestos, removing it down to the sheathing, repairing whatever damage is behind it, then rebuilding the wall with a new weather barrier, flashed windows, a rainscreen cavity and new cladding. Removal is heavy, dusty work, but it is the step that lets the wall be inspected and fixed. On most older stucco homes we open, there is something behind the stucco that needs repair.
Our renovation and construction crews run the whole sequence, from the hazardous materials survey through to final trim. This guide covers the decisions that come before the first saw cut and what happens on each wall.
What is usually behind old Lower Mainland stucco
Most stucco homes built from the 1960s through the 1990s, including many Vancouver Specials, have stucco applied directly over building paper and wire lath on the sheathing. There is no drainage gap, so the paper is the only thing between the stucco and the wood. Older houses often have shiplap boards rather than plywood under the paper.
When we strip these walls, the same patterns repeat.
- Soft sheathing below window corners, where water got past the sill and had no way out.
- Rot at roof to wall corners that never had kick-out flashing, often running down the wall in a wedge.
- Damage under deck ledgers and balcony doors, where the stucco was simply caulked to the deck.
- Building paper that has turned brittle and tears like old newspaper.
- Stucco buried below grade or in garden soil, wicking water into the bottom plate.
A good quote includes a unit rate or allowance for sheathing and framing repair, because nobody can see the extent until the stucco is off. A quote that assumes no repair on an old face sealed wall is guessing.
Remove or overclad
Overcladding means fastening strapping through the stucco into the studs and hanging siding on top. It avoids demolition and disposal, and it is sometimes chosen to save money.
The drawbacks are serious in this climate. Any damage inside the wall stays there. Every window ends up recessed deeper into a thicker wall, so it cannot be flashed properly without removing stucco around it anyway. Fasteners have to find studs blind through hard stucco, which often cracks around them. The old paper behind the stucco, which may already be failing, becomes the only water barrier.
Full removal costs more in labour and bins but gives a clean wall. Sheathing can be repaired, windows can get sill pans and head flashings, and the new weather barrier and rainscreen go on as one system. On the large majority of homes we see, removal is the right call. Our comparison of James Hardie vs stucco in BC covers the cases where keeping stucco makes sense.
Asbestos testing comes first
Older stucco, textured finishes and some patching compounds can contain asbestos. WorkSafeBC requires a hazardous materials survey before renovation or demolition work on buildings where it may be present, and older stucco walls fall into that. Samples are taken from each finish and patch type, because a wall that has been repaired over the years may have several.
If results are clear, removal goes ahead. If asbestos is found, a licensed abatement contractor removes that material under the required procedures before our crew starts. It adds time to the schedule, and it is not a step any contractor should offer to skip.
How a conversion runs, one wall at a time
- Setup. Scaffold goes up, windows and landscaping are covered, and bins are placed. Stucco is heavy, and narrow side yards on many city lots mean debris often moves by wheelbarrow.
- Removal. The stucco is cut into sections and pried off with the lath and old paper, back to bare sheathing.
- Inspection. We probe the sheathing with an awl at every window corner, along the bottom plate and below roof and deck junctions, and take moisture readings where wood looks stained.
- Repairs. Soft sheathing and any rotted studs or plates are replaced. Wet but sound wood is left open to dry before it is covered.
- Weather barrier and flashing. New house wrap or membrane goes on with sill pans, head flashings and a base flashing, all lapped so water runs out. Our post on house wrap vs building paper explains the lapping.
- Windows. Existing windows are re-flashed into the new wall, or new windows go in if they are in scope.
- Rainscreen and insulation. Exterior insulation goes on first if planned, then strapping to form the drainage cavity, with screen at the top and bottom.
- Cladding and trim. Siding, corners, window trim, soffit and fascia close the wall.
Each wall is weather tight before the next is fully opened. On a wet week we open less and close faster.
Windows during the conversion
Older stucco homes often have aluminum or early vinyl windows with nailing fins, and the stucco was simply caulked against the frame. Once the stucco is off, the fin and the paper around it are exposed, and we often find the paper lapped the wrong way at the head.
If the windows are near the end of their life, this is the cheapest time to replace them, since the opening is already exposed. Our post on replacing siding and windows together covers the order. If the windows are sound, we cut the stucco back carefully, add a sill pan where possible and integrate the existing fin with new head flashing and membrane.
Choosing the new cladding
- Fibre cement, such as James Hardie siding, is the most common choice, in lap, panel or board and batten.
- Woodgrain aluminum and metal suit modern elevations, accents and soffit.
- Vinyl works on budget focused projects where fire separation rules allow it.
- A mix, usually lap on the main walls with panel or woodgrain at the entry.
Stucco walls are thinner than most new assemblies, so the new wall will sit a little proud of the old foundation line. We plan a base flashing that steps the cladding cleanly over the concrete and keeps it clear of grade.
Adding exterior insulation
With the walls stripped to the sheathing, a conversion is the natural time to add continuous exterior insulation. It cuts heat loss through the studs and can support an energy upgrade, but it adds depth, so windows may need extension jambs or to move outward. Our guide to adding exterior insulation when you re-side an older home covers those choices.
Partial conversions and transitions
Some homes keep stucco on the lower storey and go to siding above, or convert the street elevation first. That works when the transition is detailed properly.
- Horizontal transitions need a flashing that sits behind the new weather barrier above and kicks out over the stucco below, with a drip edge so water leaves the wall.
- Vertical transitions belong at an inside or outside corner, where a material change reads as intentional.
- The stucco being kept should be checked at the transition, since the first wall opened often shows what the rest of the house is hiding.
A partial conversion spreads the cost, but be realistic. If the stucco staying on has the same age and assembly as the stucco coming off, it is probably heading the same way.
Questions to ask before you sign
- How is sheathing and framing repair priced, and how will you show me what you found before you replace it?
- Who does the hazardous materials survey, and what happens to the schedule if asbestos is found?
- Will every window get a sill pan and head flashing, or only the new ones?
- How is the bottom of the new wall finished where it meets the foundation and grade?
Clear answers to these tell you more about a contractor than the cladding brand on the quote.
Living at home through the work
Most households stay in the house. Removal is loud and dusty for the first days on each wall, windows on the active side are covered for part of the time, and some doors and decks are off limits while scaffold is up. We clean debris and nails from the yard at the end of each day, and your foreman walks through the sequence with you before the first wall comes off.
Permits and municipal checks
Rules vary between municipalities. A like for like re-side may not need a permit in some cities, while changes to the wall assembly, windows or structure can. Ask early about window size changes and whether exterior insulation affects setbacks. Our post on siding permits in the Lower Mainland covers the common cases.
If you are thinking about converting a stucco house, contact Mega Siding for a free quote and an assessment of the existing walls.